Experience The Magic of Colour
Pack Sizes
-
1 Ltr, 4 Ltrs,10 Ltrs,20 Ltrs
1100 Shades
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination.
Sand the surface using #180 Sandpaper and clean thoroughly. Ensure that no loose particles are sticking to the wall
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days.
Thinning
-
Stir well before thinning the Paint
-
Mix 30 - 35% of potable water
Application Procedure
Ensure that fresh walls are coated with one or two coats of white cement
Apply 2 coats of AquaFresh Wall Primer with an interval of 4 - 5 hrs between subsequent coats
Undulations in the wall can be levelled using any good quality acrylic putty or cement based putty
Putty should be used between the first and second coat of AquaFresh Wall Primer and sanding of the putty shall be done as per recommendation
Apply 2 coats AquaFresh interior wall finish with an interval of 4 to 5 hours between subsequent coats, after subjecting the second coat of AquaFresh Wall Primer to sanding using #320 Sandpaper
Sanding of the top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen color. Darker shades may require additional coats
Pack Sizes
-
1 Ltr, 4 Ltrs,10 Ltrs,20 Ltrs
1110 Shades
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination.
Sand the surface using #180 Sandpaper and clean thoroughly. Ensure that no loose particles are sticking to the wall
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days.
Thinning
-
Stir well before thinning the Paint
-
Mix 30 - 40% of potable water
Application Procedure
Ensure that fresh walls are coated with one or two coats of white cement
Apply 2 coats of ALTURA Wall Primer with an interval of 3 - 4 hrs between subsequent coats
Undulations in the wall can be levelled using any good quality acrylic putty or cement based putty
Putty should be used between the first and second coat of ALTURA Wall Primer and sanding of the putty shall be done as per recommendation
Apply 2 coats ALTURA Emulsion with an interval of 4 to 5 hours between subsequent coats, after subjecting the second coat of ALTURA Wall Primer to sanding using #320 Sandpaper
Sanding of the top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen color
Darker shades may require additional coats
Pack Sizes
-
1 Ltr, 4 Ltrs,10 Ltrs,20 Ltrs
937 Shades
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination.
Sand the surface using #180 Sandpaper and clean thoroughly. Ensure that no loose particles are sticking to the wall
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days.
Thinning
-
Stir well before thinning the Paint
-
Mix 40 - 45% of potable water
Application Procedure
Ensure that fresh walls are coated with one to two coats of white cement
Apply 2 coats of Wall Primer Interior with an interval of 3 – 4 hrs between subsequent coats
Undulations in the wall can be levelled using any good quality acrylic putty or cement powder putty
Putty should be used between the first and second coat of Wall Primer Interior . Sanding of the putty shall be done as per recommendation
Apply 2 coats of Visa Interior Emulsion with an interval of 4 to 5 hours between subsequent coats, after subjecting the second coat of Wall Primer Interior to sanding with #320 Sandpaper
Sanding of the first coat of top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen colour
Darker shades may require additional coats
Pack Sizes
-
1 Ltr,4 Ltrs,10 Ltrs and 20 Ltrs
1014 Shades
Features
-
5 - Best in Class
-
4 - Very Good
-
3 - Good
-
2 - Average
-
1 - Poor
-
Opacity
(5/5)
-
Durability
(5/5)
-
Brightness
(5/5)
-
Gloss
(5/5)
-
Water Resistance
(5/5)
-
Dirt Pick up
(5/5)
-
UV Resistance
(4/5)
-
Algae/Fungi Growth
(4/5)
- UV Resistance depends on Shade
- Algae/Fungi Growth subject to conditions
- Eco-friendly Lead Content - Less than 90 PPM
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination
For areas severely affected by algae and fungi, ensure that the surface is completely cleaned before initiating the painting process
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days
Thinning
-
Stir well before thinning the Paint
-
Mix 30 - 35% of potable water
Application Procedure
Ensure that fresh walls are coated with one or two coats of white cement
Apply 1 to 2 coats of AquaFresh Wall Primer with an interval of 4 - 5 hrs between subsequent coats
Apply 2 coats AquaFresh exterior wall finish with an interval of 5 to 6 hours between subsequent coats, after subjecting to first / second coat of AquaFresh Wall Primer to sanding using #320 Sandpaper
Sanding of the top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen color. Darker shades may require additional coats
Pack Sizes
-
1 Ltr,4 Ltrs,10 Ltrs and 20 Ltrs
1110 Shades
Features
-
5 - Best in Class
-
4 - Very Good
-
3 - Good
-
2 - Average
-
1 - Poor
-
Durability
(4/5)
-
Brightness
(4/5)
-
Water Resistance
(4/5)
-
Dirt Pick up
(3/5)
-
UV Resistance
(4/5)
-
Stain Resistance
(3/5)
-
Washablity
(3/5)
- Algae/Fungi Growth subject to conditions
- UV Resistance : relative to colour
- Eco-friendly Lead Content - Less than 90 PPM
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination
For areas severely affected by algae and fungi, ensure that the surface is completely cleaned before initiating the painting process
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days
Thinning
-
Stir well before thinning the Paint
-
Mix 30 - 35% of potable water
Application Procedure
Ensure that fresh walls are coated with one or two coats of white cement
Apply 1 to 2 coats of AquaFresh Wall Primer with an interval of 4 - 5 hrs between subsequent coats
Apply 2 coats AquaFresh exterior wall finish with an interval of 5 to 6 hours between subsequent coats, after subjecting to first / second coat of AquaFresh Wall Primer to sanding using #320 Sandpaper
Sanding of the top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen color. Darker shades may require additional coats
Pack Sizes
-
1 Ltr,4 Ltrs,10 Ltrs and 20 Ltrs
919 Shades
Surface Preparation
Ensure that the surface is clean and free from dampness, dirt and other contamination.
For areas severely affected by algae and fungi, ensure that the surface is completely cleaned before initiating the painting process
Freshly plastered surfaces must be allowed to cure completely. The coating process can be started after a minimum period of 30 days.
Thinning
-
Stir well before thinning the Paint
-
Mix 40 - 45% of potable water
Application Procedure
Ensure that fresh walls are coated with one to two coats of white cement before initiating the painting process
Apply 1 – 2 coats of Wall Primer Exterior with an interval of 3 – 4 hrs between subsequent coats
Sanding of the first / second coat of Wall Primer Exterior can be done using #320 Sandpaper
Apply 2 coats of Campus Exterior Emulsion with an interval of 4 to 5 hours between subsequent coats. Sanding of the first coat of top coat can be done with #600 Sandpaper
The number of coats of top coat depends on the chosen colour
Darker shades may require additional coats